Development of Block D Project:

Development of Block D Project:

The constructing operations of block D has finished and was delivered to respectful buyers since 21.06.2014. Currently, many respectful buyers have resided in this block and it is under exploitation.

READE MORE
Development of Block C Project

Development of Block C Project

-Workshop equipment, including: fencing the land (project fencing); purchasing, installing and establishing a 60-ton weighbridge, and 20-ton, 16-ton and 12-ton tower cranes; purchasing required machineries, including loader, dump truck, etc. ; purchasing temporary electricity for the workshop; selecting and concluding the contract of consultation phase 3 and established laboratory; and concluding contract with different contractors, etc.

-Land leveling operations for implementing foundation and deep foundation operations.

-Complete construction of in situ concrete piles and sandy pillars.

-Complete concreting.

-Complete foundation operations.

-Complete construction and installation of a metal skeleton.

-Complete construction of the shear wall and ceiling.

-Complete implementation of walls.

-Complete implementation of stonework of corridors' floor.

-Complete construction and installation of doors' and wardrobes' frame.

-Construction and installation of kitchens' cabinets, doors and wardrobes – under implementation.

-Electrical and mechanical facilities operations for units – under implementation.

-Construction of the project's required elevators.

-Complete construction and installation of UPVC double glazed windows.

-Complete insulation of terraces and rest rooms.

-Complete ceramics and tile works for the floors of units.

-Construction of the metal skeleton in the northern and southern parking lots.

-Construction of elevators' metal skeleton.

-Construction of units' suspended ceilings.

-Construction of concrete ceilings for the southern parking at the ground floor.

-Complete construction of the northern and southern composite's view.

-Determination of the slope and insulation of the roof.

-Construction of the concrete water tank.

-Implementation of the incoming and outgoing ramps.

READE MORE
Development of Block B Project

Development of Block B Project

-Workshop equipment, including: fencing the land (project fencing); purchasing, installing and establishing a 60-ton weighbridge, and 20-ton, 16-ton and 12-ton tower cranes; purchasing required machineries, including loader, dump truck, etc. ; purchasing temporary electricity for the workshop; selecting and concluding the contract of consultation phase 3 and established laboratory; and concluding contract with different contractors.

-Land leveling operations for implementing foundation and deep foundation operations.

-Complete construction of in situ concrete piles and sandy pillars.

-Complete concreting.

-Complete foundation operations.

-Complete construction and installation of a metal skeleton.

-Construction of the shear wall and ceiling until 20thfloor.

-Framing of internal walls – under implementation.

-Construction of the metal skeleton of central lobby.

-Construction of the concrete ceiling and shear walls of central lobby.

-Construction and complete installation of the metal skeleton in central lobby.

-Complete construction of the concrete ceiling and shear walls of central lobby.

-Complete construction of the metal skeleton of elevators in central lobby.

-Metal skeleton of northern and southern parking lots in central lobby – under implementation.

 

READE MORE
Development of Block A Project

Development of Block A Project

1. Workshop equipment, including: fencing the land (project fencing); purchasing, installing and establishing a 60-ton weighbridge, and 20-ton, 16-ton and 12-ton tower cranes; purchasing required machineries, including loader, dump truck, etc. ; purchasing temporary electricity for the workshop; selecting and concluding the contract of consultation phase 3 and established laboratory; and concluding contract with different contractors.

2. Land leveling operations for implementing foundation and deep foundation operations.

3. Complete construction of in situ concrete piles and sandy pillars.

4. Complete concreting.

5. Foundation operations – under implementation.