Development of Block C Project
-Workshop equipment, including: fencing the land (project fencing); purchasing, installing and establishing a 60-ton weighbridge, and 20-ton, 16-ton and 12-ton tower cranes; purchasing required machineries, including loader, dump truck, etc. ; purchasing temporary electricity for the workshop; selecting and concluding the contract of consultation phase 3 and established laboratory; and concluding contract with different contractors, etc.
-Land leveling operations for implementing foundation and deep foundation operations.
-Complete construction of in situ concrete piles and sandy pillars.
-Complete concreting.
-Complete foundation operations.
-Complete construction and installation of a metal skeleton.
-Complete construction of the shear wall and ceiling.
-Complete implementation of walls.
-Complete implementation of stonework of corridors' floor.
-Complete construction and installation of doors' and wardrobes' frame.
-Construction and installation of kitchens' cabinets, doors and wardrobes – under implementation.
-Electrical and mechanical facilities operations for units – under implementation.
-Construction of the project's required elevators.
-Complete construction and installation of UPVC double glazed windows.
-Complete insulation of terraces and rest rooms.
-Complete ceramics and tile works for the floors of units.
-Construction of the metal skeleton in the northern and southern parking lots.
-Construction of elevators' metal skeleton.
-Construction of units' suspended ceilings.
-Construction of concrete ceilings for the southern parking at the ground floor.
-Complete construction of the northern and southern composite's view.
-Determination of the slope and insulation of the roof.
-Construction of the concrete water tank.
-Implementation of the incoming and outgoing ramps.